|
Will You Add? - How To Avoid The 10 Biggest Home Renovation Mistakes
Common Tax MistakesWell, its tax season again. That means millions of people will be rushing to file before the deadline and just as many will be eagerly awaiting their return. Tax returns are a funny thing. People tend to treat them differently than any other money. The rest of the year they will save, pinch pennies, and budget. When they get their tax return, they go wild.In fact, I’ve seen people go so far as to make sure extra taxes are withheld throughout the year just so that they can have a large return! One person I talked to said that they did this as part of their saving plan. This does not make good financial sense though. First of all, as I mentioned, people tend to spend the money from their returns more freely. Second of all, you are allowing the government use of your money throughout the year. You are not paid interest or anything like that on your oversized return. Had you invested the e ith the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get miscommunicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further. Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, and meant the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design.Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth What is Spyware? Find Out Now And Protect Yourself!Spyware and Adware viruses have rapidly become the number
one threat to your computer with over 90% of computers
already infected. These include "Trojans", Web Bugs, Advertiser
Software, Monitoring Software and more. Fortunately there are
good spyware protection and adware spyware virus removal
tools available. Sorting through them all to find the right one is a
challenging task and an important decision to make.Consequences From Spyware: hijacked browsers, reset home
pages, changed search results, spam emails sent to you, slow
browsers, toolbars added to your browser, and many more.You Need To Understand What Spyware Is!Spyware and Adware, also called "Malware", are files made by
publishers that allow them to snoop on your browsing activity,
see what you purchase and send you "pop-up" ads. They can
slow down your PC, cause it to crash, record your c When planning your home remodeling or renovation project one of the main decisions you need to make is who will manage the project. You may have engaged a Designer, and add managing the project to their contract. Alternatively, as is common practice, the main builder may act as the Contracting Manager. Or you may decide to take on the project management role yourself.Designing a building or renovation is not just about how it will look and function but also what materials are used, when they are needed, ensuring payments are made to suppliers and subcontractors, and quality assurance. If you feel you have the experience to deal with this, great. But be warned, its not as easy as it may sound. Contracting your own home result in savings of up to 20 percent but can end up costing you more than if you contracted out, if delays, poor engagement and low quality results. The 10 most common mistakes made by homeowners acting as remodeling and renovation project managers are: - Insufficient Planning - the success of your project is probably 80% based upon good planning. This means dealing with as much detail as possible up front; always planning for contingencies and checking the progress of work against the plan every day. Small things can mount together to be big outcomes, and not always favourable. A plan keeps you focused when there seems to be multiple activates going on at any one time. Project management can be a full time job so part of your planning is ensuring that you have sufficient time to dedicate to the project management role. If you don't know what a Critical Path is - find out. This structure of dependencies will be the defining thread of your project plan.
- Poor Materials Management - Time and Materials planning is a big task but it can be very costly not having the right materials in the correct quantity at the right time. In large projects you will engage a quantity surveyor to estimate the material requirements. Some may add a time element to your material requirements plan, otherwise you need to work closely with your builder and supplier to ensure that lead times are built into the delivery scheduling of materials to avoid delays.
- Not Planning Sufficiently For Contingencies - materials can become unavailable due to warehouses burning down, transport strikes, import problems and even short supply being given to a more valued customer. Labour can become unavailable due to illness, injury or overrun on previous jobs. You need to have contingency plans to manage this and understand the impact of an alternative choice of materials in terms of the support structure required and finishing. Remember - What is possible in six weeks, on average takes ten weeks and in a worst-case scenario could be twelve to fifteen weeks. You need to be able to reschedule to meet these types of delays.
- Poor Record Keeping - keep and file everything, and keep records well organised. Your finance provider will most likely require proof of completion at each stage and a summary of expenditure to date, before releasing the next progress payment. If not using finance, good record keeping is just good management. You need to know exactly where you are in terms of time and dollars against the plan specification. This should be the final task you do each night.
- Not Managing The Work Site - there are a number of regulations and workplace safety items that need to be covered during any building project. When trying to keep costs down it is tempting to throw caution to the wind and avoid the cost of indemnity insurance for destruction or property and for injury to those working on and visiting the site. If you do, you are a fool - and any builder or subcontractor who works on a site without ensuring these things are in place, are also foolish. Ensure that your subcontractor agreements make them responsible for safety and insurance of their area of work.
- Slack Quality Assurance - use a work-check-approve-work cycle on every stage of the project. The three most critical parts of the project from a QA perspective are the foundations, framing and services. The foundations are the base upon which every other part of the design specification relies. Get this wrong and the problems start snowballing. QA is one task that should NEVER be rushed through or passed over when under time pressure. The downline impacts are too great.
- Poor Subcontractor Management - one benefit of using a builder as the project manager is that they have a network of trusted subcontractors. In a full home renovation, there can be 20-30 subcontractors. You need to use a well planned system for engaging, qualifying, contracting and managing your subcontractors. And remember to check and sign off their work BEFORE they leave the site and certainly before you pay them. You may like to engage an independent building consultant to manage these inspections.
- Poor Communication - Act professionally, it gives subcontractors more confidence that the project will be well managed. Let everyone involved with the project know what you are expecting from them in terms of deliverables and quality. Even with the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get miscommunicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further.
- Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, and meant the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design.
- Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth
Interviewing Candidates: 3 Ways to Avoid Snap JudgmentsHave you ever hired the wrong person? If so, perhaps you are an emotional interviewer?An emotional interviewer tends to make judgments on first impressions. In a matter of minutes, an emotional interviewer may decide if someone is competent or not. Not surprisingly, they often make poor hiring decisions.All hiring managers are susceptible to "emotional" hiring mistakes. Why? Because we are human and we like to hire people that we like or that may mirror ourselves.First impressions, good or bad, tend to skew the interviewer's evaluation of a candidate. Given the difficulty of overcoming first impressions, what can you do as a hiring manager to avoid making hiring decisions based on emotion?• First, conduct phone interviews. Phone interviews are an excellent way to avoid first impression mistakes. You will not be influenced by appearance or gestures; allowing t always favourable. A plan keeps you focused when there seems to be multiple activates going on at any one time. Project management can be a full time job so part of your planning is ensuring that you have sufficient time to dedicate to the project management role. If you don't know what a Critical Path is - find out. This structure of dependencies will be the defining thread of your project plan. - Poor Materials Management - Time and Materials planning is a big task but it can be very costly not having the right materials in the correct quantity at the right time. In large projects you will engage a quantity surveyor to estimate the material requirements. Some may add a time element to your material requirements plan, otherwise you need to work closely with your builder and supplier to ensure that lead times are built into the delivery scheduling of materials to avoid delays.
- Not Planning Sufficiently For Contingencies - materials can become unavailable due to warehouses burning down, transport strikes, import problems and even short supply being given to a more valued customer. Labour can become unavailable due to illness, injury or overrun on previous jobs. You need to have contingency plans to manage this and understand the impact of an alternative choice of materials in terms of the support structure required and finishing. Remember - What is possible in six weeks, on average takes ten weeks and in a worst-case scenario could be twelve to fifteen weeks. You need to be able to reschedule to meet these types of delays.
- Poor Record Keeping - keep and file everything, and keep records well organised. Your finance provider will most likely require proof of completion at each stage and a summary of expenditure to date, before releasing the next progress payment. If not using finance, good record keeping is just good management. You need to know exactly where you are in terms of time and dollars against the plan specification. This should be the final task you do each night.
- Not Managing The Work Site - there are a number of regulations and workplace safety items that need to be covered during any building project. When trying to keep costs down it is tempting to throw caution to the wind and avoid the cost of indemnity insurance for destruction or property and for injury to those working on and visiting the site. If you do, you are a fool - and any builder or subcontractor who works on a site without ensuring these things are in place, are also foolish. Ensure that your subcontractor agreements make them responsible for safety and insurance of their area of work.
- Slack Quality Assurance - use a work-check-approve-work cycle on every stage of the project. The three most critical parts of the project from a QA perspective are the foundations, framing and services. The foundations are the base upon which every other part of the design specification relies. Get this wrong and the problems start snowballing. QA is one task that should NEVER be rushed through or passed over when under time pressure. The downline impacts are too great.
- Poor Subcontractor Management - one benefit of using a builder as the project manager is that they have a network of trusted subcontractors. In a full home renovation, there can be 20-30 subcontractors. You need to use a well planned system for engaging, qualifying, contracting and managing your subcontractors. And remember to check and sign off their work BEFORE they leave the site and certainly before you pay them. You may like to engage an independent building consultant to manage these inspections.
- Poor Communication - Act professionally, it gives subcontractors more confidence that the project will be well managed. Let everyone involved with the project know what you are expecting from them in terms of deliverables and quality. Even with the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get miscommunicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further.
- Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, and meant the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design.
- Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth
Flash Intros On Websites - Why It's Time To Ditch The Flash IntroOne of the most common requests I get from web design clients is "can I have a Flash intro with that?" These are words that good professional web designers dread to hear. Flash intros are an artifact of 90's web design; a fad and a novelty which is still so prevalent that some users still demand it. From the website owner's perspective, I can see how a slickly-made, animated Flash introduction must be good thing - what better way to show off their fantastic website than to decorate it with an expensive (and equally expensive-looking) introduction? The aim of this article is to explain why Flash intros are a very bad thing in terms of design, usability and search engine visibility.If you are considering adding a Flash intro to your website, ask yourself the following questions:Would your website users like it? The vast majority of web users would find it an unnec erials in terms of the support structure required and finishing. Remember - What is possible in six weeks, on average takes ten weeks and in a worst-case scenario could be twelve to fifteen weeks. You need to be able to reschedule to meet these types of delays. - Poor Record Keeping - keep and file everything, and keep records well organised. Your finance provider will most likely require proof of completion at each stage and a summary of expenditure to date, before releasing the next progress payment. If not using finance, good record keeping is just good management. You need to know exactly where you are in terms of time and dollars against the plan specification. This should be the final task you do each night.
- Not Managing The Work Site - there are a number of regulations and workplace safety items that need to be covered during any building project. When trying to keep costs down it is tempting to throw caution to the wind and avoid the cost of indemnity insurance for destruction or property and for injury to those working on and visiting the site. If you do, you are a fool - and any builder or subcontractor who works on a site without ensuring these things are in place, are also foolish. Ensure that your subcontractor agreements make them responsible for safety and insurance of their area of work.
- Slack Quality Assurance - use a work-check-approve-work cycle on every stage of the project. The three most critical parts of the project from a QA perspective are the foundations, framing and services. The foundations are the base upon which every other part of the design specification relies. Get this wrong and the problems start snowballing. QA is one task that should NEVER be rushed through or passed over when under time pressure. The downline impacts are too great.
- Poor Subcontractor Management - one benefit of using a builder as the project manager is that they have a network of trusted subcontractors. In a full home renovation, there can be 20-30 subcontractors. You need to use a well planned system for engaging, qualifying, contracting and managing your subcontractors. And remember to check and sign off their work BEFORE they leave the site and certainly before you pay them. You may like to engage an independent building consultant to manage these inspections.
- Poor Communication - Act professionally, it gives subcontractors more confidence that the project will be well managed. Let everyone involved with the project know what you are expecting from them in terms of deliverables and quality. Even with the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get miscommunicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further.
- Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, and meant the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design.
- Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth
Free or Cheap Appraisals - How Good Are They?People naturally want to save money where they can, and those wanting to sell or refinance their homes are no exception. Perhaps the most important question anyone thinking about doing these things can ask is how much the home is worth on the market. The value of the property is obviously critical to selling or buying, and will be a primary factor in obtaining a loan. An appraisal can answer this question, but that service isn't cheap. A typical home appraisal fee will run anywhere from $250 to $400 depending on where the property is and what it contains. Naturally, many people seek an alternative to this fee and a search of the internet will reveal a lot of companies and web sites that offer a free or relatively inexpensive solution.Many web sites advertise "free" appraisals. These are typically web sites that ask a home owner to provide a property address and personal contact informa and insurance of their area of work. - Slack Quality Assurance - use a work-check-approve-work cycle on every stage of the project. The three most critical parts of the project from a QA perspective are the foundations, framing and services. The foundations are the base upon which every other part of the design specification relies. Get this wrong and the problems start snowballing. QA is one task that should NEVER be rushed through or passed over when under time pressure. The downline impacts are too great.
- Poor Subcontractor Management - one benefit of using a builder as the project manager is that they have a network of trusted subcontractors. In a full home renovation, there can be 20-30 subcontractors. You need to use a well planned system for engaging, qualifying, contracting and managing your subcontractors. And remember to check and sign off their work BEFORE they leave the site and certainly before you pay them. You may like to engage an independent building consultant to manage these inspections.
- Poor Communication - Act professionally, it gives subcontractors more confidence that the project will be well managed. Let everyone involved with the project know what you are expecting from them in terms of deliverables and quality. Even with the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get miscommunicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further.
- Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, and meant the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design.
- Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth
High Impact Email Marketing & How To Create ItHigh Impact Email Marketing can make you rich. The money is truly in the list and you need to start building a list and marketing to it. Imagine if after a few years you had a list of 300,000 subscribers. Think about if you sent out a weekly email for a product that made you an average of $45. If you got only 0.5% to buy you would make an easy $70,000.That is insane from one email. Now we both know that it is rare to have a list of 300,000 and usually 0.5% is a very low response rate. You will usually get at least 3-5% to buy from your list. So think about it this way if you had a list of 3,000 and you got 3% to buy your $45 product you would get 90 sales and make $4,050. Still pretty nice for one message.To make 90 sales could take you forever if you were using other marketing methods, but if you already have a list it would be easy with high impact email marketing. Her ith the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get miscommunicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further. - Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, and meant the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design.
- Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth a mention as the final item on our top 10 list. All project will overrun the initial estimate. It is normal practice to add 15% contingency to allow for alternative materials, increased costs, higher cost for replacement labor etc. It is so easy for $40 here and $25 there to become $3000 over a two or three week project. This is why it is so imperative to update your expenditure every single day so you know exactly where you are. There is nothing that will stop a building project in its tracks faster than subcontractors fear of not getting paid.
HTTP = HTML link (for blogs, profiles,phorums):
<a href="http://www.atriclecheck.com/article/139181/atriclecheck-How-To-Avoid-The-10-Biggest-Home-Renovation-Mistakes.html">How To Avoid The 10 Biggest Home Renovation Mistakes</a>
BB link (for phorums):
[url=http://www.atriclecheck.com/article/139181/atriclecheck-How-To-Avoid-The-10-Biggest-Home-Renovation-Mistakes.html]How To Avoid The 10 Biggest Home Renovation Mistakes[/url]
Related Articles:
Conference Call Services
The Conference Call -Saves time, saves money.
Starting Your Small Health Food Business
The latest trend to hit America is consumption of healthy food. More and more consumers are searching for fresher, healthier, unprocessed, and nutritive foods that will help them stay fit and healthy.
Affiliate Marketing - Success On The Web
Affiliate marketing is one of the best ways to make money on the Internet. New affiliates drop like flies every month because of this one, best kept secret of affiliates.
|